14 December 2012
Rebuilding a kitchen
Old kitchen furnitures.
Old kitchen furnitures removed
New electric cables, conduits (plastic tubes) and electric installation boxes installed.
Wooden beams inserted in between the old beams in order to strengthen the wall and to have strong points for fixing the new kitchen furnitures.
Rebuilding the walls with new plasterboards.
Using some plasterboard filler.
Installing stop valves onto the hot and cold water pipes.
Installing the new kitchen furnitures.
A new kitchen sink and water tap with all the pipes and tubes in place.
Tiling the walls above kitchen worktop and installing the kitchen fronts.
Just some coving, a new ceiling lamp, some door handles and knobs left :)
Etiketter:
Construction,
Kitchen
Subscribe to:
Post Comments (Atom)
salt likit
ReplyDeletesalt likit
dr mood likit
big boss likit
dl likit
dark likit
RH31